Disruption Information

19.12.2018

Ambergate Engineering Works

Major improvement work is affecting East Midlands Trains services between 10th and 16th February 2019


What's happening?

A £13million upgrade of the railway in Derbyshire will deliver the full renewal of Ambergate Junction. This is a crucial part of the rail network where the Matlock branch line leaves the Midland Main Line. Once complete, it will bring improvements to the speed at which trains can travel on this section of track and will help to improve punctuality and reliability.

The major work to renew Ambergate Junction will be taking place between 10th and 16th February 2019 which will result in some changes to train services that run through Ambergate, including Derby to Matlock services (the Derwent Valley Line). There will also be a revised timetable between Sheffield/Chesterfield to Derby and London St Pancras, with fewer trains able to run during the works.

Routes affected:

 • London services

• Sheffield, Chesterfield to Derby services

• Derby to Matlock services

What does this mean for my journey?

 

London Services

Fewer trains will be able to run between Sheffield and London, and a revised timetable will be in place:

One train an hour will run between Sheffield and London, calling at Chesterfield and Leicester only. This train will be diverted resulting in a longer journey time

One train an hour will run between Derby and London, which will call at Long Eaton, East Midlands Parkway and Loughborough to Leicester resulting in a longer journey time.

Our full breakfast menu will not be available on services from Derby, instead replaced with our lighter breakfast menu option. 

Departing from

FULL Breakfast

Lighter Breakfast

Leeds

05:19

 

Wakefield Westgate

05:32

 

Sheffield

05:31  06:33  07:26

 

Chesterfield

05:44  06:45 07:38

 

Nottingham

07:11

 

Derby

No FULL breakfast offer

05:02  05:19  07:23  07:30

Our revised timetable for Sunday 10th February can be found here: 

Our revised timetable for Monday 11th February to Friday 15th February can be found here:

Our revised timetable for Saturday 16th February can be found here: 

Sheffield, Chesterfield and Derby Services

• There will be no direct East Midlands Trains services from Sheffield/ Chesterfield to Derby – CrossCountry customers will still be able to travel.

• All CrossCountry services from Sheffield to Derby will stop at Chesterfield. As the trains will need to follow a diversionary route, journey times will be increased by 30 minutes.

Derby to Matlock Services

• All train services between Matlock and Derby will be replaced with coach services

A temporary timetable is in place for our Nottingham - Derby - Matlock line, valid from 10th February 2019 to 16th February 2019. 

Download our complete rail and bus timetable for the full Matlock-Derby-Newark Castle route. 

Download our bus only timetable for the Matlock-Derby route. 

You should buy your ticket from the ticket vending machine where it is possible to do so. Where this is not possible due to the location of the bus pick up location you should buy your ticket on arrival at Derby.

• Train services between Derby and Newark Castle will start and terminate at Derby (please change onto the replacement coach service for connections to/from Matlock). 

• CrossCountry services between Derby and Nottingham will run as normal.

 

For more information on replacement coaches click here

If you require assisted travel for your journey please visit our website by clicking here and booking in advance. 

You can plan your journey by using our online journey planner here.

We are available 24/7, if you need some help you can now also chat on line with us 0800 until 1900  here .